« software.applied-geodesy.org
Java·Applied·Geodesy·3D
Log in
Register
Search:
Back to the entry by Imran
Post reply
Reply to the message by
Imran
Name:
E-mail:
(optional, won't be displayed directly)
Leave this field empty:
Homepage:
(optional)
Leave this field empty:
Location:
(optional)
Subject:
Formatting help
skip to input
format text bold
[b]bold text[/b]
format text italic
[i]italic text[/i]
insert hyperlink
[link=http://example.com/]link text[/link] / [link]http://example.com/[/link]
set text color
[color=#rgb]colored text[/color]
insert list
[list][*]list item[/list]
insert image
[img]http://example.com/image.jpg[/img]
left: [img=left]http://example.com/image.jpg[/img]
right: [img=right]http://example.com/image.jpg[/img]
thumbnail: [img=thumbnail]http://example.com/image.jpg[/img]
thumbnail left: [img=thumbnail-left]http://example.com/image.jpg[/img]
thumbnail right: [img=thumbnail-right]http://example.com/image.jpg[/img]
insert media resource
[media=video]http://example.com/file.mp4[/media]
[media=audio]http://example.com/file.mp3[/media]
insert TeX code
[tex]TeX code[/tex]
insert code
[inlinecode]code[/inlinecode]
[code]code[/code]
[code=css]code[/code]
[code=html]code[/code]
[code=javascript]code[/code]
[code=matlab]code[/code]
[code=perl]code[/code]
[code=php]code[/code]
[code=sql]code[/code]
[code=xml]code[/code]
:-)
;-)
:-D
:-P
:-|
:-(
:-/
:-S
8-)
O:)
:-x
:cool:
:angry:
:crying:
:oops:
Message:
> Greetings, I have been using JAG3D for about a year now and getting really familiar with it. Recently, I have done some observations in a small microtriangulation network. The instrument in question is Trimble S7. Now, exporting the .job (jx) format for integration into JAG3D i have raised some questions about averaging observations functions (ctrl + G command). Seeings as there are aprox. about 700 measurements with only about 9 points (5-6 rounds per point and two-way distance observations with zenith angles) I am in need of averaging the observations. After doing the averaging, I noticed that the hor. angles are consistent with Topocad (comparing adjustments) rounds reductions, but after reviewing the distances imported they are significantly different then measured values displayed in topocad. My question is why is that the case? I think that the distances are maybe reduced by the prism constant although it is not displayed anywhere? Does it maybe reduce the distances from sloped to horizontal when I select (.job 2D) the job uppon importation? Still the distances are very different. If need be, I could reply with the .job file and screenshots for more information about the problem. > > Best regards, > Imran.
E-mail notification on reply of this posting
I agree to the
data privacy statement
OK - Submit
Preview